The Doorway Estimate Is a Contract Draft. Read the Scope, Warranty, and Change Clause Before You Sign
A written estimate for widening a doorway or removing a threshold sets what you pay, what the work covers, and what happens when the job grows. Check those three things before you sign.
Most households sign a home-work estimate while the contractor is standing in the hallway and the wheelchair is waiting on the other side of the wall. That is the wrong order. The estimate is the contract draft. Whatever it leaves out, you will either pay for later or not get at all.
Local option: New Plan Care gives families in the St. Louis area in-home help so a parent can stay home: companionship, help with bathing and dressing, meals, and overnight care. Call (314) 405-0887.
Read the scope line
The scope should name the new opening width, the header or frame work, the trim, the paint or primer, and who removes and hauls away the old door and debris. If the page says only 'widen doorway,' ask for each item to be listed. Then compare that list to the room itself. Does the new opening clear her chair, your walker, and the turn you have to make to get through it?
Check the warranty words
Ask for the warranty in writing and read three things: how long the workmanship is covered, whether the materials carry their own warranty, and who you call when something fails. A warranty that promises to fix defects 'as needed' with no time period is not much of a promise. Ask whether the warranty still applies if the company closes or changes its name.
Find the change clause
Many estimates include a line about changes. If the crew finds rot in the framing or wiring that does not meet code, the price moves. Ask how changes get approved. A good answer is a written change order, signed by you before the extra work starts, with the new total. A weak answer is a crew lead saying it will be fine.
Ask whether there is a hidden-damage allowance and, if so, what it covers and what it does not. Ask when the deposit is due, what the payment schedule looks like, and what happens to the deposit if the job stops halfway through.
Before you sign
Put five items on one page: the scope list, the warranty period, the change order rule, the payment schedule, and the start date. If you have two estimates, compare them line by line. Where one lists an item and the other is silent, ask the second company what it left out. Keep the signed copy in the same folder as her other papers, and note the start date on the day sheet so someone is home when the crew arrives.