The day sheet
The Doorway Widening Quote Is Not the Whole Plan. Put the Care Day in the Contract.
Before work starts, make the paperwork name the usable route, blocked hours, cleanup, daily handoff and the person responsible when the doorway cannot be used.
A doorway may need to be widened so your wife can pass through with her walker, wheelchair or your help. The contractor sees a wall, a frame and a door. You see the route between her bed, bathroom, chair and the outside door.
Do not sign from a one-line quote that says only "widen doorway." The job is not complete merely because the opening is wider. The paperwork needs to cover the hours when the route is blocked, what remains usable, who cleans the floor and what happens if the opening is not ready by evening.
Measure the route before asking for a quote
Start with the equipment and the route your wife actually uses. Measure the widest part of the wheelchair, walker or other device. Include anything that projects from it, such as wheels, hand rims, footrests, a bag or an oxygen holder. Do not assume the width printed on equipment paperwork is the full operating width.
Then follow the whole trip. Look at the approach to the doorway, the turn through it and the space on the other side. A wider opening does not solve a tight turn, a raised threshold or a door that swings into the space she needs.
Write down what the contractor is being asked to inspect:
- The clear opening when the door is fully open
- The wall space on both sides
- The direction of the door swing
- The floor transition under the door
- Nearby switches, outlets, vents and trim
- The turning space before and after the opening
- The route she will use while work is underway
If you are not sure what clearance her equipment requires, ask the person who supplied or fitted it. Ask for the needed operating space in writing. The contractor can then quote against a stated requirement instead of a guess.
Make the quote describe the finished doorway
The quote should name the exact doorway and the finished clear opening. It should say whether the price includes removing the existing door and frame, changing the wall opening, moving wires or switches, installing the new frame and door, repairing the wall, replacing trim, painting and fixing the flooring or threshold.
Ask what is excluded. A low number can leave you arranging a painter, electrician or flooring repair after the carpenter leaves. If another trade may be needed, the contract should say who schedules that person and whether the work can stop until a new price is approved.
Have every change put in writing before the extra work begins. The change should identify the new task, added amount and effect on the usable route. A spoken "we can take care of that" is hard to match against the final bill.
Put the blocked hours on a 24-hour day sheet
Use a sheet that runs from 6 a.m. to 6 a.m. Mark every trip that normally passes through the doorway. Include toileting, meals, medication setup, rest, bathing, bedtime and any planned arrival by an aide or family member.
A simple day sheet might read:
6 a.m. - Help her from bed to the bathroom before tools and materials enter the route.
8 a.m. - Contractor confirms which doorway will be blocked and shows you the temporary route.
Noon - Named helper covers lunch and toileting while the opening is unfinished.
3 p.m. - Contractor gives a finish-or-stop decision, not just a general progress report.
5 p.m. - You test the route with the equipment before the crew packs up.
6 p.m. - Contractor hands the space back clean, lit and usable, or activates the written backup plan.
10 p.m. - Bedtime route uses the completed opening or the named alternate route.
2 a.m. - Nighttime bathroom route remains open without tools, cords, loose covering or stored materials.
Put a name beside each handoff. "Family will help" is not a handoff. Write the person, arrival time, task and phone number.
Write the evening failure plan before work starts
Ask one direct question: If the doorway is not usable at the promised handoff time, what will the contractor do before leaving?
The written answer should cover a secure temporary opening, exposed edges, dust containment, lighting, floor protection and removal of tools and cords from the care route. It should also identify who you call after the crew leaves and what that person is authorized to arrange.
Do not accept a plan that depends on you lifting your wife over a threshold, squeezing equipment through an unsafe gap or moving her to a room with no workable bathroom route. If the alternate route requires another person, arrange that person before the work begins.
Separate completion from final payment
Read the payment schedule before signing. Identify the deposit, any progress payment and the amount due after the final walk-through. Ask what event makes the job "complete." Completion should mean more than installation of a door.
Your walk-through should include:
- Passing the actual equipment through the opening
- Making the approach and turn from both directions
- Opening, closing and latching the door
- Checking the threshold for a new bump or loose edge
- Checking that switches, outlets and vents still work as expected
- Confirming that dust, fasteners, scraps and tools are gone
- Checking that the nighttime route has working light
Write unfinished items on a punch list. Give each item an owner and a return arrangement. Keep a copy with the quote, contract, change orders, payment records and photographs of the finished opening.
Read the warranty for the parts that can fail
Ask for the workmanship warranty and each product warranty before final payment. Check what is covered if the door drags, the latch stops aligning, trim separates, the threshold loosens or repaired wall surfaces crack.
The paperwork should tell you whom to contact, what information to provide and whether labor is included. Ask whether another contractor's repair would affect coverage. Keep the model or product information for installed hardware with the warranty.
Also ask what is not covered. Normal adjustment, paint touch-up and damage caused by equipment may be treated differently. You need the boundary in writing so a later repair call does not begin with an argument about whose job it is.
The handoff at the door
Before the contractor leaves, stand at the opening with the day sheet. Run the next trip your wife must make, not an empty-doorway demonstration. If she is resting, use the actual equipment and follow the full route without her.
The final handoff is short: the route works, the floor is clear, the door works, the warranty contact is saved and any return work is written down. If one of those items is missing, the job may look finished while the care day is still broken.